PROJECT DETAILS:

Decoration to New Cumbria Nuclear Constabulary Training Facility including specialist Flooring

PROCESS :

This project included the preparation and painting of ceilings, walls, plasterboards and blockwork substrates including lots of high level works from MEWPS and scaffold access. Using Story Offsite Spray Painting Facility Woodwork was painted with a satin finish in contrasting colours and then painting to all walls, and ceilings was carried out by airless spray, brush and roller. Metal staircases were also painted with a metal shield finish. We also painted the plantroom floors with a single pack floor paint. We prepared and coated up all of the floors in the 50 metre and 100 metre firing ranges including the demarcations. The floors were first given a vacuum controlled diamond grind and shot blasted prior to the application of anti slip floor coating products

CHALLENGES :

This was a highly confidential and secure site and materials were required to be stored in a controlled way by locking in a secure area.

SUPPLIERS :

Dulux Satin, metal shield, vinyl and diamond matt – Floor products from Reepol – Reecote EC017SR & W/F

Project Name:

CNC Training Facility

Client Name:

Morgan Sindall

Services:

Decoration to New Cumbria Nuclear Constabulary Training Facility

Length of Contract:

10 months